This project provides for the design, land acquisition, and construction of 1,300 linear feet of roadway widening and resurfacing along Snouffer School Road between Centerway Road and Turkey Thicket Drive and a new traffic signal at Alliston Hollow Way and Turkey Thicket Drive, providing left-turn lanes at both signals as well as providing for grading for two northern lanes and resurfacing two southern lanes from Turkey Thicket Drive to Alliston Hollow Way.