This project provides an elevated pedestrian walkway that will span over the interchange ramps for I-495 on the west side of Georgia Avenue (MD 97). The total length of the walkway is 1,357 feet. The project consists of two bridges spanning three interchange ramps.The remaining portions of the elevated path will be constructed on cantilevered retaining walls, U-shaped walls, retaining wall sections,and embankments.